Government Projects

Name of Project and Location Description of Project and Service Provided Duration
RAJUK, Dhaka
Survey, for 3 Roads—Dayaganj to Jurain, Stargate to Notredame College, Motijheel to Shaplachattar. SURVEYING 95-96
Name of Project and Location Description of Project and Service Provided Duration
             LGED
Survey and Soil Test of 10 School of Jamalgonj Upozila. – 2019. SURVEYING 2019
Survey and Soil Test of 4 School of South Surma Upozila. – 2019 2019
Master Plan Zokigonj Upazila Porishad, Sylhet. 2010
Soil Test of Bridge over Surma River—South Sunamgonj, Upazila – 2019. 2019
Soil Test of 20 Bridges of Sunamgonj District. 2019
Design of Bridge in Chhararpar in Sylhet City Corporation 3/1/2001 to 10/10/2001
Name of Project and Location Description of Project and Service Provided Duration
RHD Dept. Sylhet
Reconnaissance Survey to fix up Proposed Alignment of 52.00 KM Long Beanibazar-Golapganj-Fenchuganj Road. SURVEYING January 2009
Detail Engineering Topographical Survey Hobygonj Town Bypass Road 10 k.m. Road Alignment. Feb-2010
Detail Engineering Topographical Survey downstream at Kazir Bazar Bridge, Sylhet. April-2010
Detail Engineering Topographical Survey Sylhet Flyover. 10 Dec-20
Survey work at proposed bridge of Sylhet-Golapganj-Charkhai-Zokignoj Road. February 2009
Survey work for proposed Bridge of Companygonj-Chhatak Road. July 2008
Survey work for Sylhet Salutikor. Companygonj-Volagongj Road. March-2009
Detail Engineering Survey of Chouhatta-Kumarpara-Naiorpool-Shajalal Bridge. July - 2007
Survey Work for Boro Vanga Bridge Saltanpur-Balaganj road 25 km. Sept. 2005
Survey work Sultanpur-Balaganj Potherkhara Bridge on 21 km. September 2007
Amberkhana-Tukerbazar Road Survey. September 2007
Detail Survey of under Beanibazar-Golapganj-Fenchuganj Road Bridge at Juri River. Feb-2009
Deatails Survey work Beanibazar-Golapgonj-Fenchuganj Road for Pagla River. Feb-2009
Deatails Survey work Beanibazar-Golapgonj-Fenchuganj Road for Lola Khal. Feb-2009 Feb-2009
Deatails Survey work Beanibazar-Golapgonj-Fenchuganj Road for Badepahsa Khal. Feb-2009
Deatails Survey work Beanibazar-Golapgonj-Fenchuganj Road for Meherpur Khal. Feb-2009
Detail Engineering Topographical Survey Beanibazar-Golapganj-Fenchuganj Road 52km Road Alignment. Feb-2009
Detailed Survey of Keane Bridge, Sylhet. Aug,00-Oct, 00
Detailed Survey of Humayan Rashid Square, Sylhet. Aug,00-Oct, 00
Detailed Survey of Sheikhgaht to Telibazar. Aug,00-Oct, 00
Detailed Survey of Chandarpur Bridge. Aug,00-Nov, 00
Survey Work of Beanibazar Golapgonj Fenchugonj Road at 26th KM to 30KM Under Sylhet Road Division. May 2005
Topographical Survey on Amberkhana By Pass Road under Sylhet Road Division. September 2006
Detail Land Acquisition work 52 km Beanibazar-Golapganj-Fenchuganj Road. Land Acquisition March 2009
Sub Surface Soil Investigation for bridge at 24th Km of Sylhet-Sultanpur-Balaganj Rd. 15 Days
"Sub Surface Soil Investigation of bridge at 18h Km Sylhet-Sultanpur-Balaganj Rd." SOIL Investigation 15 Days
Sub Surface Soil Investigation of Kura bridge at 14th Km of Golapganj-Bhaadeswar Rd. 15 Days
Sub-soil Investigation at Kazirbazar Bridge. 15 Days
Sub-soil Investigation at Sylhet Jonal Office Alampur Sylhet. 5 Days
Sub-soil Investigation at Nobigonj-Baniyachong Road. 5 Days
Sub-soil Investigation for proposed at 14 KM of Gobindogonj Chhatak Dowara bazar Road. 30 Days
Sub-soil Investigation at Paharpur Baalgachhi Road. 7 Days
Sub-soil Investigation at Manda-Bagmara-Atria Road. 25 Days
Sub-Soil Investigation at Elashbari-Raninagar Road. 15 Days
Sub-Soil Investigation at Rashidpur-Bishawanath-Rampahsha-Lamakazi (Gap No. 10/1) Road. 1.53
Sub-Soil Investigation at Amirdin Khal (Gap No. 1/1) . 1.00
"Sub-Soil Investigation Companygoanj-Chhatak Road (Gap No. 9/1, 10/1)." 3.90
"Sub-Soil Investigation work for Boro Vanga Bridge Saltanpur-Balaganj road 25 km." 4.50
"Sub-Soil Investigation work Potherkhara Bridge Sultanpur-Balaganj  on 21 km." 4.50
Sub-Soil Investigation for–Chhatak-Companygonj Road (Gap No. 11/1, & Ula Khal Bridge. 2.98
Sub-Soil Investigation for Kashi Khal Bridge (Gap No. 1/1, & Golapgonj Dhaka Dashkhin. 1.00
Sub Surface Soil Investigation of proposed Kalni bridge over the Sunai river of 5th Km of Latu-Joldup Rd. 15 Days
Sub Surface Soil Investigation at 15th Km of Sari-Goainghat Rd. 15 Days
Subsoil Boring and Suggesting Corrective measure Against Catastrophic Slope in Sylhet-Tamabil High Way:(23rd to 28th KM0. 31/5/2002 to 5/6/2002
"Sub-Soil Investigation at Slutikor-Companygonj-Volagganj (Gap No. 11/1) Road." August 2008
Name of Project and Location Description of Project and Service Provided Duration
R&H Dept. Sunamganj
Detailed Survey of border Road 12.5 KM Under Sunamganj Division. June,2001
Survey work for proposed bridge on Survma River at Sunamganj Bishamberpur Road Under Sunamganj Road Division. October 2005
Survey work for proposed bridge on Survma River at Chhatak Dowarabazar Road Under Sunamganj Road Division. October 2005
EIA of Gazaria under Sunamgonj Road. Feburary-2008
Sub Surface Soil Investigation for proposed Hargoor bridge of 48th Km Gap at Thakurcona-Jamalgonj Rd.  SOIL Investigation 15 Days
Sub Surface Soil Investigation for proposed bridge at 13th Km Gap at Kashirgati-Biswamberur Rd. 15 Days
Sub Surface Soil Investigation for proposed bridge at 18th Km Gap at Kukrapushi-Sunamganj-Jamalganj Rd. 15 Days
Name of Project and Location Description of Project and Service Provided Duration
Road Division Sunam Gonj
34th KM Gap (Gap #34/1)At Pagla Jagannathpur, Raniganj, Aouskandi Road SOIL Investigation 14/06/2000 to 21/06/2000
Sunoi bridge for 14th KM gap At Dharmapasha Madhayanagar Road, Sunamganj 7/1/99
18th km Gap at Niamathpur, Tahirpur, Badhaghat, Takerghat Road, Sunamganj. 26/12/98
Name of Project and Location Description of Project and Service Provided Duration
R&H Dept. Moulovibazar
Sub Surface Soil Investigation Moulvibazar-Kulaura-Juri Rd. (Continala bridge). SOIL Investigation 15 Days
Sub Surface Soil Investigation of Bisawa Rd. at 13th Km of Moulvibazar Rd. Division. 15 Days
Sub Surface Soil Investigation for construction of at 4th Km Gap # 4/1 of Juri-Borolrkha-Baraigram Rd. 15 Days
Name of Project and Location Description of Project and Service Provided Duration
R&H Dept. Hobigonj
Sub-soil Investigation at Hobigonj-Dholiya Khal-Shayestagonj. SOIL Investigation 7 Days
Detail Engineering Topographical Survey Hobigonj Town Bypass Road 10 k.m. Road Alignment. Feb-2010
Name of Project and Location Description of Project and Service Provided Duration
BPDB
Consumer Census, Filling up of Computer Input Codes & Pole Numbering under Sales & Distribution Division-1,PDB, Sylhet . March 20, 96 to March 15, 98
Consumer Census, Filling up of Computer Input Codes & Pole Numbering under Sales & Distribution Division-2, PDB, Sylhet . March 20, 96 to March 15, 98
Consumer Census, Filling up of Computer Input Codes & Pole Numbering under Sales & Distribution Division-3, PDB, Sylhet . March 20, 96 to March 20, 98
Consumer Census, Filling up of Computer Input Codes & Pole Numbering under Sales & Distribution Division-1, PDB, Comilla. March 30, 97 to June 18, 97.
Consumer Census, Filling up of Computer Input Codes & Pole Numbering under Distribution Division, PDB, Brahmanbaria. March 30, 97 to July 28, 97.
Name of Project and Location Description of Project and Service Provided Duration
Bangladesh Water Development Board
Design & Cost estimation of 5 Vents Sluice Gate at Capter Hawor Project at Catal Khara. June 10, 97 to 10 July 97 1996-1997
Name of Project and Location Description of Project and Service Provided Duration
BADC, Sylhet
Integrated Agriculture Development Project Including orange and pineapple Development project in greater Sylhet District (Survey, Sub-soil investigation, design, cost estimation, tender document preparation and supervision). Survey, Sub-soil investigation, design, cost estimation, tender document preparation and supervision 1st January 2006 to 31st December 2006
Name of Project and Location Description of Project and Service Provided Duration
Bangladesh Civil Aviation Authority
Freight Terminal Building of Osmany Airport: Soil Investigation, Plan, Design, Cost Estimate & Tender Document. Soil Investigation, Plan, Design, Cost Estimate & Tender Document Jan 94 to Mar 94
Name of Project and Location Description of Project and Service Provided Duration
Bangladesh Medical Relief Foundation
Freight Terminal Building of Osmany Airport: Soil Investigation, Plan, Design, Cost Estimate & Tender Document. Drawing ,Design,Estimation , Supervision Construction
Name of Project and Location Description of Project and Service Provided Duration
Bangladesh Foundry and Engineering Works ltd.
Proposed Dormitory Building at Gas Plant, Alutall, Sylhet. Drawing, Design,Estimation , Supervision Construction
Name of Project and Location Description of Project and Service Provided Duration
Sylhet City Corporation
Laldighi Hawkers Market Architectural Design, Survey, Supervision, Electrical & Mechanical Design, Soil Test, Structural Design, Estimate, Tender Document, Preparation of Schedule etc. BUILDING 17-Aug-92 to
Pouro Biponi Kendra Soil Test, Structural Design, Estimate & Tender Document, Supervision 20-Aug-91-19-Sep-91
Pouro Municipal Market Soil Test, Structural Design, Estimate & Tender Document, Supervision Aug-92 to Oct 92
Master Plan & Survey Malnichhara Khal Project. SURVEYING 2018
Name of Project and Location Description of Project and Service Provided Duration
Moulovibazar Pouroshova
4 Storied KITCHEN MARKET Plan, Design, Estimate, Tender Documents, Survey, Soil test & Report, Model, Full time Supervision. Plan, Design, Estimate, Tender Documents, Survey, Soil test & Report, Model, Full time Supervision. Oct 98 to Dec 99
Name of Project and Location Description of Project and Service Provided Duration
Hobigonj Pouroshova
Pouro Biponi Kendra Soil Investigation, Plan, Design, Cost Estimate & Part time Supervision. Soil Investigation, Plan, Design, Cost Estimate & Part time Supervision. Oct 94 to Dec 94
Name of Project and Location Description of Project and Service Provided Duration
Beanibazar Pourashava
4 storied Kitchen Market Drawing, Design, Estimation, Soil Test & Supervision Drawing, Design, Estimation, Soil Test & Supervision
Name of Project and Location Description of Project and Service Provided Duration
SUST
4 (Four) Storied School Building at Shahjalal University, Sylhet. Drawing, Design, Estimation, Soil Test & Supervision BUILDING
Name of Project and Location Description of Project and Service Provided Duration
Occidental of Bangladesh Ltd.
KAPNA -1 location for Well Site approach road needed to be supplemented by placement of specialize survey equipment— Total Station. SURVEYING 18-Apr-99 to 17-May-99
To provide Technical & Drafting Assistance (ROW). 01-Sep-97 to 30-Dec-97
Prepare road survey & BID package for MB#1 damaged road (Sreemangal-Kamalganj road repair project). 19-Feb-98 to 28-Feb-98
Design & Supervision Consultancy Service for JB#1 Drill Site expansion. Gas Field Exploration and Facility Service 01-Jun-97 to 30-Nov-97
Determine Degree of compaction % of sub-grade in area Drill Pad & Rig location. Sep 11, 97- Dec 15, 97
Preliminary Study & designed for river dock for Oxy Materials Department for unloading materials Chengerkhal river. Jan 18, 98- Feb 18, 98
Additional work for compaction test at Oxy Barashala Pipe yard location. Jun 10, 98 – Oct 21, 98
To provide Engineering Service regarding preparation of the design for the proposed scope of work-related construction of access road & Drill site development for JB#5/K, located in the Malnicharra & Lackatoorah Tea Garden. July 28, 98 to August 28,98
To preparing Engineering Drawings/Specification for JB#2-5 Section. 10-Sep-98 to 22-Sep-98
To provide Temporary Environmental Clearance along the JB#1- JB# 2 Access Rd. & JB#3 by the DOE. 14-Feb-98 to 21-Feb-98
To provide Engineering Consultancy Service regarding construction of New Drill Pad & Cellar at Oxy BIBIYAYNA location including access Road. 13-July-98 to 12-Sep-98
To provide Engineering Service & Design Specifications for JB#5 located in the Malnicharra & Lackatoorah Tea Garden. 21-July-98 to 20-Aug-98
To prepare the Papers/ Documents for Hill Cutting Environmental clearance for JB#1 to JB# 2 & Gas Plant. 17-Sep-98 to 16-Nov-98
To provide Engineering Service at Slope Protective Work Gas Plant location. 13-May-99 to 31-July-99
To provide 2 Engineers for Additional Supervision Gas Pipeline / ROW installation for Oxy Gas Plat to Kailastilla. 17-Sep-98 to 16-Dec-98
To provide project management service for the completion of unfinished portion of job JB#5 location. 27-Jan-99 to 10-Feb-99
To Prepare Compensation cost estimates for Cracked Structures & Facilitates Possession for the Seismic Survey work BIBIYANA location. Jan 19, 99 to April 18, 99
To provide Water Table estimation & monitoring for a year the Gas Plant location. 1-Mar-99 to 28-Feb-00
To provide project management service for the completion of unfinished portion of job at Oxy KAPNA location. 26-Mar-99 to 9-Apr-99
To provide Engineering Service for JB#5 Access Rd. via Malnicharra Tea Garden (Highway-Garden Factory Section). 10-Apr-98 to 16-May-98
To prepare Sketch plot plan of well site, design the Flood Protection Dyke & Sketch Cross Section KAPNA location for Well Development. 8-Apr-99 to 16-May-99
To provide Scope of Work for visit & inspect all the structure Cracked by SEISMIC SURVEY. 17-Apr-99 to 2-May-99
To provide Engineering Service for MB#2 Well Site Drill Pad Construction. 20-May-99 to 25-July-99
To provide 2 Field Inspectors for Oxy Donated Tube well installation at BIBIYANA location. 12-Jun-99 to 11-Sep-99
To provide Engineering Services such as design, cost estimate documents, job supervision for community relations project including KAPNA. 15-July-99 to 14-Sep-99
Attend Meeting at Oxy/UNOCAL Dhaka office for Maxwell litigation. 19-Aug-99, 20-Sep-99
To prepare architectural, Structural, Electrical &sanitation design, Engineers Estimate, BID document Preparation & assisting contractor selection, Geo-technical investigation Project work Management/ Supervision to construct DIGALBAG high school at BIBIYANA location. Jan,17-1999
To provide the L.A.O. in Sylhet with assistance concerning the documents needed to acquire ROW for the North South Pipeline. Land Acquisition Land Acquisition 30-Nov-97 to 14-Jan-98
To provide the L.A.O. in Sylhet with assistance concerning the documents needed to acquire ROW for the North South Pipeline. 15-jan-98 to31-jul-98
To provide the L.A.O. in Sylhet with assistance concerning the documents needed to acquire ROW for the North South Pipeline. 1-Aug-98 to 30-Dec-98
To do Additional Works & time extension, prepare documents, Power of Attorney for absentee landowners & keep photocopies ROW. 1-Oct-99 to 13-Jan-00
To provide the Land Officer in Sylhet with assistance concerning the documents needed to acquire ROW for the North South Pipeline. 1-Nov-98 to 31-Nov-98
To Revise Schedule to assist L.A.O. office staffs to Speed up & expedite Cheque payment & Deed checking procedure work of ROW. 10-Nov-98 to 28-Feb-98
To facilitate Acquisition formalities of ROW for Gas Plant to North South Pipe Line at Kailastilla (Project Manager). July-99 to October 99
Land Transfer Deed Execution Service (ROW). 10-Jun-99 to 9-Aug-99
KAPNA Land Transfer Deed Execution Service. 26-Jun-99 to 30-Oct-99
Railway Embankment Along Gas Field MB-1 . 24/06/97 to 27/06/97
Feasibility Study for Restoration of Rly. Track along well no MB-1 . Census and Feasibility Study 21-Aug-97 to 20-Sep-97
Feasibility Study of Transportation Network of the Sylhet, Dhaka & Chittagong area. 24-Jan-98 to 15-Feb-98
Design & Supervision Consultancy of Gas Plant Access Rd. at Sylhet . Roads, Railways, Sluice Gate & Bridges 01-Jun-97 to 30-Sep-97
Provide Railway Re-route design consultancy at MB-1 Drill site at Srimangal. 01-Jun-97 to
Provide Structural Analysis of Railroad Bridges . 28-Jun-97 to
Construction, Supervision construction services to upgrade of MABEY Bridge. 20-Aug-97 to 16-Sep-97
Prepare Design & Specifications for RAILWAY track Relocation at Srimangal. 30-Aug-97 to 15-Oct-97
Construction Management Consulting Service to install PSB over Doloi river DEWRACHARRA-MUNSHIBAZAR ROAD. 8-Feb-98 to 5-March-98
To provide Engineering design & cost estimate for the KAPNA river bridge needed for access to KAPNA-1 location. 2-Apr-99 to 11-May-99
To provide Engineering Service for JB#5 Access Rd. via Malnicharra Tea Garden (Highway-Garden Factory Section). 10-Apr-98 to 16-May-98
300 ft long Bridge on Dewrachara-Munshirbazar Road in Moulvibazar. 1989
Name of Project and Location Description of Project and Service Provided Duration
Unocal
Land Survey MB Development station May 2004
Engineering, design, specification, and quality control test services for MB-plant site. Gas field Exploration and Facility Service. February 8, 2004 to February 29, 2004
Compaction test for quality control services for MB plant. March 14, 2004 to April 27, 2004
Engineering, design, supervision, geotechnical, quality control, engineering survey and consultancy services for Moulavibazar (MB) development May 1, 2004 to December 31, 2005
To provide services to study of settlement behavior of oil tank foundation at Moulvibazar (MB) gas plant and provide appropriate corrective measure (services) for the company. August 25, 2005 to December 31, 2005
To provide services for land acquisition and reacquisition for MB-4 gas gathering pipeline for Moulvibazar (MB) Development. Land Acquisition December 23, 2004 to may 30 2005
To provide services for land acquisition and reacquisition for Moulvibazar (MB) gas sales pipe line. March 8 2004 to September 28, 2004
To provide services for land acquisition and reacquisition for MB-5 gas gathering pipeline for Moulvibazar (MB) Development. February 6, 2005 to May 15 2005
Proposed office building at JB-1 Lackatura, Sylhet BUILDING
To provide Engineering Service for the Construction of DIGALBAK High School 17-Jun-99 to 16-Dec-99
Dormitory Building Survey, Soil Test, Design (Civil, Electrical & Sanitation), Cost Estimation.
Office building Survey, Soil Test, Design (Civil, Electrical & Sanitation), Cost Estimation.
Warehouse Survey, Soil Test, Design (Civil, Electrical & Sanitation), Cost Estimation.
Name of Project and Location Description of Project and Service Provided Duration
Sylhet Gas Field
Retrofitting of Control Room Kailashtila Gas Field. Retrofitting 2020
Design of Slope Protection Correction Work of New Office Building at Sylhet Gas Field Ltd. Chiknagul, Jaintapur, Sylhet. Slope Protection 2021
Name of Project and Location Description of Project and Service Provided Duration
Jalalabad Gas Transmission & Distribution System.
138Km Gas Pipeline Network Survey of Sylhet Town (3rd Natural Gas Development Project) Kailastilla-Islampur Gas Pipeline Survey, Sub Soil Investigation of Surma river at Kuchai & Chattak. SURVEYING Oct 94 to Apr 95
Surma River crossing at Kuchai, Sylhet. SOIL Investigation
Surma River crossing at Chhatak, Sunamganj.
Name of Project and Location Description of Project and Service Provided Duration
Chevron
Fire fighting Utility Building Survey, Soil Test, Design (Civil, Electrical & Sanitation), Cost Estimation. Survey, Soil Test, Design (Civil, Electrical & Sanitation), Cost Estimation.
Name of Project and Location Description of Project and Service Provided Duration
Cherrington Asia Ltd.
Survey of Route form Shalutikor Jetty Point to Golapgonj Drill site. SURVEYING 30-Oct-98 to 29-Nov-98
Name of Project and Location Description of Project and Service Provided Duration
Kaeverner Process System Ltd. Asia Pacific
Supervision (Gas Plant Site), Concrete Cube Test, Compaction test, Bridge & Culvert Design, Gas Plant Access Road & Culvert Works, and Contractors Invoice Checking. Gas field Exploration and Facility Service. 12-Feb-98 to 30-Mar-99
Supervision (Gas Plant Site), Concrete Cube Test, Compaction test, Bridge & Culvert Design, Gas Plant Access Road & Culvert Works, and Contractors Invoice Checking. 12-Feb-98 to 30-Mar-99
Name of Project and Location Description of Project and Service Provided Duration
Lafarge Surma Cement Ltd
Plane Table & Topo Graphical Survey designated location of CCCL & its link strip of LSC proposed Plant. SURVEYING 3-Aug-98 to 2-Sep-98
Reconnaissance survey, preliminary Route Planning for Belt Conveyor Way from Chattak Cement Company Ltd. Site to the lime stone query –providing alternative route choice. June 28,98 – Aug 98
Plain table Survey to exhibit the Railway Infrastructure & incorporate the same in the already prepared location map. June 28,98 – Aug 98
Detailed Survey Including Fixation of Co-ordination of factory area.
Detailed Survey Including Fixation of Co-ordination of Colony area.
Land Acquisition work for Jetty Area Lafarge Surma Cement Ltd. at Chhatak. Land Acquisition 12-Aug-98 to 22-May-00
Land Acquisition Work Cement Factory Project, Chhatak. Soil Investigation 12-Aug-98
Sub-Soil Investigation for Proposed 270 Cubic Metre Water Tank At Chattak, Sunamgonj. 2017
Approach Road Work at Chhatak: Design & supervision service. Design & supervision service January 2008
Community Development Building Lafarge Surma Cement Ltd. Chhatak. June, 2002-April 2003 June, 2002-April 2003
EMP Study of Clay Sourcing Environmental and Morphology Study 2020
Name of Project and Location Description of Project and Service Provided Duration
Apon Property
B+G+13- Storied Residential Building at Lovely Road, Subid Bazar, Sylhet. Survey, Soil Test, Design (Civil, Electrical & Sanitation) and Cost Estimation. Survey, Soil Test, Design (Civil, Electrical & Sanitation) and Cost Estimation.
15-Storied APON BLUE TOWER at Sagardigir Par, Sylhet. Survey, Soil Test, Design (Civil, Electrical & Sanitation) and Cost Estimation. Nov. 2009 to dec.2011
14-Storied APON WHITE HOUSE at Sagardigir Par, Sylhet. Survey, Soil Test, Design (Civil, Electrical & Sanitation) and Cost Estimation. 10 July, 2011
10 Storied APON GULZAR TOWER at Hawapara, Sylhet Survey, Soil Test, Design (Civil, Electrical & Sanitation) and Cost Estimation. 10 Feb, 2015 to Dec-2019
10 Storied APON HOME at Hawapara, Sylhet Survey, Soil Test, Design (Civil, Electrical & Sanitation) and Cost Estimation.
Name of Project and Location Description of Project and Service Provided Duration
Paragon Property Limited
10 Storied Residential Paragon Tower-01 Building. Survey, Soil Test, Design (Civil, Electrical & Sanitation) and Cost Estimation. Survey, Soil Test, Design (Civil, Electrical & Sanitation) and Cost Estimation. 06 Mar, 07 to Dec-09
10 Storied Residential Paragon Tower-02 Building. Drawing, Design, Estimation, Soil Test & Supervision 15 April, 07 to Feb-10
10 Storied Residential Paragon Tower-03 Building. Survey, Soil Test, Design (Civil, Electrical & Sanitation) and Cost Estimation. 27 June, 07
Name of Project and Location Description of Project and Service Provided Duration
Dreamland Properties Developer
5 Storied Dream Home Residential Building at E-Block Upashahar, Sylhet Survey, Soil Test, Design (Civil, Electrical & Sanitation) and Cost Estimation.
7 Storied Arba Home Residential Building at Shuveccha-100, Fazilchist R/a, Subidbazar, Sylhet
6-Storied Osrah Home Residential Building at Uposhohar-Block:A, Road No:2,House No:08
7-storied Asar Home Residential Building at Shuveccha-100, Fazilchist R/a, Subidbazar, Sylhet
7-storied RAWDA GARDEN Residential Building at Shuveccha-168, Fazilchist R/a, Subidbazar, Sylhet 2021-2022
(G+8) Nine Storied AZHAR HOME Residential Building at Shibgonj, Sylhet 2022-Ongoing
Name of Project and Location Description of Project and Service Provided Duration
Oyster Poultry Farm
Retrofitting of Poultry firm -2 Buildings Retrofitting 2020-2021
Construction of 12m Bridge at Oyster poultry farm at Darabazar. Survey, Soil Test, Design (Civil, Electrical & Sanitation) and Cost Estimation. 2012
Modern Poultry Farmhouse Construction at Darabazar, Sylhet (Drawing, Design, Estimation, Soil Test & Supervision)
Retrofitting of Poultry Shed at Darabazar, Sylhet (Drawing, Design, Estimation, Soil Test & Supervision)
Name of Project and Location Description of Project and Service Provided Duration
ARK
Survey Work for ARK Real Estate Bridge at Khushi Khal Bridge and approach road Shahporan Upashahar, Sylhet. Survey, Soil Test, Design (Civil, Electrical & Sanitation) and Cost Estimation. Nov-2010
Construction work of 60m bridge at Muktir Char Shahparan, Uposhahar, Sylhet. 10 April 2011
Name of Project and Location Description of Project and Service Provided Duration
Al-Baraka Property Ltd.
18-meter long R.C.C. Bridge & Approach Road at Knowledge City, Sylhet. Survey, Soil Test, Design (Civil, Electrical & Sanitation) and Cost Estimation. 2013
Name of Project and Location Description of Project and Service Provided Duration
Popular Diagnostic Centre
10 (Ten) Storied Popular Medical Center at Sylhet. Survey, Soil Test, Design (Civil, Electrical & Sanitation) and Cost Estimation. June 2009 to dec.2011
Name of Project and Location Description of Project and Service Provided Duration
Lions Club of Sylhet
4 Storied Lions Children Hospital at Sylhet Survey, Soil Test, Plan, Design, Cost Estimate, Tender Document preparation & full time Engineering Supervision. Survey, Soil Test, Design (Civil, Electrical & Sanitation) and Cost Estimation. Sep 15, 93 to Dec 25, 93
Name of Project and Location Description of Project and Service Provided Duration
Red Crescent Sylhet
Red Crescent Maternity Hospital, Sylhet Drawing ,Design,Estimation & Supervision Survey, Soil Test, Design (Civil, Electrical & Sanitation) and Cost Estimation.
Name of Project and Location Description of Project and Service Provided Duration
Mr. Ragib Ali
Retrofitting of Modhuban Super Market. Retrofitting
Name of Project and Location Description of Project and Service Provided Duration
Sylhet International University
Retrofitting of Administrative 5 (Five) Storied Building at, Sylhet International University, Sylhet. Retrofitting
Name of Project and Location Description of Project and Service Provided Duration
DEMAS Technical Support
Sand Boring in Surma River, Chhatak. Conduct Boring, Necessary Geo-technical Laboratory test & furnishing report. Procurement & supply of Surma river Chhatak Stage for a year. SOIL Investigation 08-Nov-98 to 26-Dec-98
Name of Project and Location Description of Project and Service Provided Duration
N.C.M.P.D.J Road.
Sub-soil Investigation at N.C.M.P.D.J Road. SOIL Investigation 15 Days
Name of Project and Location Description of Project and Service Provided Duration
Sylhet Partnership
Topographic & Contour Survey of Sylhet Porzaton Corporation (Airport Road Sylhet).
Name of Project and Location Description of Project and Service Provided Duration
City Corporatation
Master Plan & Survey Malnichhara Khal Project. SURVEYING 2018
Name of Project and Location Description of Project and Service Provided Duration
Pvt. donor
Construction work of 30m bridge at Alika River , Balaganj 2006-2008
Name of Project and Location Description of Project and Service Provided Duration
Al-Baraka Property Ltd.
18-meter long R.C.C. Bridge & Approach Road at Knowledge City, Sylhet. Survey, Soil Test, Design (Civil, Electrical & Sanitation) and Cost Estimation. 2013
Name of Project and Location Description of Project and Service Provided Duration
Eastern Housing Sylhet
Land Development at Sylhet Land Development Sept. 2009 to dec.2011
Name of Project and Location Description of Project and Service Provided Duration
Al-Mocca Housing at Sylhet
Land Development at Sylhet Land Development Dec 2009 to Oct.2011
Name of Project and Location Description of Project and Service Provided Duration
Jameya Madrasha.
Jameya Islamiya Kamel Madrasha at Pathantula Sylhet. Survey, Soil Test, Design (Civil, Electrical & Sanitation) and Cost Estimation. June 2009 to Aug.2011
Name of Project and Location Description of Project and Service Provided Duration
Academy Committee
Jalalabad International Islamic Academy, Beanibazar, Sylhet. Drawing, Design, Estimation, Soil Test & Supervision Survey, Soil Test, Design (Civil, Electrical & Sanitation) and Cost Estimation.
Name of Project and Location Description of Project and Service Provided Duration
Md. Joynal Uddin
Retrofitting of 4 Storied Building at Beanibazar, Sylhet Retrofitting 2021
Name of Project and Location Description of Project and Service Provided Duration
Md. Shahidur Rahaman
Retrofitting of 4 Storied Building at Mohajonpotti, Sylhet Retrofitting 2021