Name of Project and Location | Description of Project and Service Provided | Duration |
RAJUK, Dhaka | ||
Survey, for 3 Roads—Dayaganj to Jurain, Stargate to Notredame College, Motijheel to Shaplachattar. | SURVEYING | 95-96 |
Name of Project and Location | Description of Project and Service Provided | Duration |
LGED | ||
Survey and Soil Test of 10 School of Jamalgonj Upozila. – 2019. | SURVEYING | 2019 |
Survey and Soil Test of 4 School of South Surma Upozila. – 2019 | 2019 | |
Master Plan Zokigonj Upazila Porishad, Sylhet. | 2010 | |
Soil Test of Bridge over Surma River—South Sunamgonj, Upazila – 2019. | 2019 | |
Soil Test of 20 Bridges of Sunamgonj District. | 2019 | |
Design of Bridge in Chhararpar in Sylhet City Corporation | 3/1/2001 to 10/10/2001 |
Name of Project and Location | Description of Project and Service Provided | Duration |
RHD Dept. Sylhet | ||
Reconnaissance Survey to fix up Proposed Alignment of 52.00 KM Long Beanibazar-Golapganj-Fenchuganj Road. | SURVEYING | January 2009 |
Detail Engineering Topographical Survey Hobygonj Town Bypass Road 10 k.m. Road Alignment. | Feb-2010 | |
Detail Engineering Topographical Survey downstream at Kazir Bazar Bridge, Sylhet. | April-2010 | |
Detail Engineering Topographical Survey Sylhet Flyover. | 10 Dec-20 | |
Survey work at proposed bridge of Sylhet-Golapganj-Charkhai-Zokignoj Road. | February 2009 | |
Survey work for proposed Bridge of Companygonj-Chhatak Road. | July 2008 | |
Survey work for Sylhet Salutikor. Companygonj-Volagongj Road. | March-2009 | |
Detail Engineering Survey of Chouhatta-Kumarpara-Naiorpool-Shajalal Bridge. | July - 2007 | |
Survey Work for Boro Vanga Bridge Saltanpur-Balaganj road 25 km. | Sept. 2005 | |
Survey work Sultanpur-Balaganj Potherkhara Bridge on 21 km. | September 2007 | |
Amberkhana-Tukerbazar Road Survey. | September 2007 | |
Detail Survey of under Beanibazar-Golapganj-Fenchuganj Road Bridge at Juri River. | Feb-2009 | |
Deatails Survey work Beanibazar-Golapgonj-Fenchuganj Road for Pagla River. | Feb-2009 | |
Deatails Survey work Beanibazar-Golapgonj-Fenchuganj Road for Lola Khal. Feb-2009 | Feb-2009 | |
Deatails Survey work Beanibazar-Golapgonj-Fenchuganj Road for Badepahsa Khal. | Feb-2009 | |
Deatails Survey work Beanibazar-Golapgonj-Fenchuganj Road for Meherpur Khal. | Feb-2009 | |
Detail Engineering Topographical Survey Beanibazar-Golapganj-Fenchuganj Road 52km Road Alignment. | Feb-2009 | |
Detailed Survey of Keane Bridge, Sylhet. | Aug,00-Oct, 00 | |
Detailed Survey of Humayan Rashid Square, Sylhet. | Aug,00-Oct, 00 | |
Detailed Survey of Sheikhgaht to Telibazar. | Aug,00-Oct, 00 | |
Detailed Survey of Chandarpur Bridge. | Aug,00-Nov, 00 | |
Survey Work of Beanibazar Golapgonj Fenchugonj Road at 26th KM to 30KM Under Sylhet Road Division. | May 2005 | |
Topographical Survey on Amberkhana By Pass Road under Sylhet Road Division. | September 2006 | |
Detail Land Acquisition work 52 km Beanibazar-Golapganj-Fenchuganj Road. | Land Acquisition | March 2009 |
Sub Surface Soil Investigation for bridge at 24th Km of Sylhet-Sultanpur-Balaganj Rd. | 15 Days | |
"Sub Surface Soil Investigation of bridge at 18h Km Sylhet-Sultanpur-Balaganj Rd." | SOIL Investigation | 15 Days |
Sub Surface Soil Investigation of Kura bridge at 14th Km of Golapganj-Bhaadeswar Rd. | 15 Days | |
Sub-soil Investigation at Kazirbazar Bridge. | 15 Days | |
Sub-soil Investigation at Sylhet Jonal Office Alampur Sylhet. | 5 Days | |
Sub-soil Investigation at Nobigonj-Baniyachong Road. | 5 Days | |
Sub-soil Investigation for proposed at 14 KM of Gobindogonj Chhatak Dowara bazar Road. | 30 Days | |
Sub-soil Investigation at Paharpur Baalgachhi Road. | 7 Days | |
Sub-soil Investigation at Manda-Bagmara-Atria Road. | 25 Days | |
Sub-Soil Investigation at Elashbari-Raninagar Road. | 15 Days | |
Sub-Soil Investigation at Rashidpur-Bishawanath-Rampahsha-Lamakazi (Gap No. 10/1) Road. | 1.53 | |
Sub-Soil Investigation at Amirdin Khal (Gap No. 1/1) . | 1.00 | |
"Sub-Soil Investigation Companygoanj-Chhatak Road (Gap No. 9/1, 10/1)." | 3.90 | |
"Sub-Soil Investigation work for Boro Vanga Bridge Saltanpur-Balaganj road 25 km." | 4.50 | |
"Sub-Soil Investigation work Potherkhara Bridge Sultanpur-Balaganj on 21 km." | 4.50 | |
Sub-Soil Investigation for–Chhatak-Companygonj Road (Gap No. 11/1, & Ula Khal Bridge. | 2.98 | |
Sub-Soil Investigation for Kashi Khal Bridge (Gap No. 1/1, & Golapgonj Dhaka Dashkhin. | 1.00 | |
Sub Surface Soil Investigation of proposed Kalni bridge over the Sunai river of 5th Km of Latu-Joldup Rd. | 15 Days | |
Sub Surface Soil Investigation at 15th Km of Sari-Goainghat Rd. | 15 Days | |
Subsoil Boring and Suggesting Corrective measure Against Catastrophic Slope in Sylhet-Tamabil High Way:(23rd to 28th KM0. | 31/5/2002 to 5/6/2002 | |
"Sub-Soil Investigation at Slutikor-Companygonj-Volagganj (Gap No. 11/1) Road." | August 2008 |
Name of Project and Location | Description of Project and Service Provided | Duration |
R&H Dept. Sunamganj | ||
Detailed Survey of border Road 12.5 KM Under Sunamganj Division. | June,2001 | |
Survey work for proposed bridge on Survma River at Sunamganj Bishamberpur Road Under Sunamganj Road Division. | October 2005 | |
Survey work for proposed bridge on Survma River at Chhatak Dowarabazar Road Under Sunamganj Road Division. | October 2005 | |
EIA of Gazaria under Sunamgonj Road. | Feburary-2008 | |
Sub Surface Soil Investigation for proposed Hargoor bridge of 48th Km Gap at Thakurcona-Jamalgonj Rd. | SOIL Investigation | 15 Days |
Sub Surface Soil Investigation for proposed bridge at 13th Km Gap at Kashirgati-Biswamberur Rd. | 15 Days | |
Sub Surface Soil Investigation for proposed bridge at 18th Km Gap at Kukrapushi-Sunamganj-Jamalganj Rd. | 15 Days |
Name of Project and Location | Description of Project and Service Provided | Duration |
Road Division Sunam Gonj | ||
34th KM Gap (Gap #34/1)At Pagla Jagannathpur, Raniganj, Aouskandi Road | SOIL Investigation | 14/06/2000 to 21/06/2000 |
Sunoi bridge for 14th KM gap At Dharmapasha Madhayanagar Road, Sunamganj | 7/1/99 | |
18th km Gap at Niamathpur, Tahirpur, Badhaghat, Takerghat Road, Sunamganj. | 26/12/98 |
Name of Project and Location | Description of Project and Service Provided | Duration |
R&H Dept. Moulovibazar | ||
Sub Surface Soil Investigation Moulvibazar-Kulaura-Juri Rd. (Continala bridge). | SOIL Investigation | 15 Days |
Sub Surface Soil Investigation of Bisawa Rd. at 13th Km of Moulvibazar Rd. Division. | 15 Days | |
Sub Surface Soil Investigation for construction of at 4th Km Gap # 4/1 of Juri-Borolrkha-Baraigram Rd. | 15 Days |
Name of Project and Location | Description of Project and Service Provided | Duration |
R&H Dept. Hobigonj | ||
Sub-soil Investigation at Hobigonj-Dholiya Khal-Shayestagonj. | SOIL Investigation | 7 Days |
Detail Engineering Topographical Survey Hobigonj Town Bypass Road 10 k.m. Road Alignment. | Feb-2010 |
Name of Project and Location | Description of Project and Service Provided | Duration |
BPDB | ||
Consumer Census, Filling up of Computer Input Codes & Pole Numbering under Sales & Distribution Division-1,PDB, Sylhet . | March 20, 96 to March 15, 98 | |
Consumer Census, Filling up of Computer Input Codes & Pole Numbering under Sales & Distribution Division-2, PDB, Sylhet . | March 20, 96 to March 15, 98 | |
Consumer Census, Filling up of Computer Input Codes & Pole Numbering under Sales & Distribution Division-3, PDB, Sylhet . | March 20, 96 to March 20, 98 | |
Consumer Census, Filling up of Computer Input Codes & Pole Numbering under Sales & Distribution Division-1, PDB, Comilla. | March 30, 97 to June 18, 97. | |
Consumer Census, Filling up of Computer Input Codes & Pole Numbering under Distribution Division, PDB, Brahmanbaria. | March 30, 97 to July 28, 97. |
Name of Project and Location | Description of Project and Service Provided | Duration |
Bangladesh Water Development Board | ||
Design & Cost estimation of 5 Vents Sluice Gate at Capter Hawor Project at Catal Khara. | June 10, 97 to 10 July 97 1996-1997 |
Name of Project and Location | Description of Project and Service Provided | Duration |
BADC, Sylhet | ||
Integrated Agriculture Development Project Including orange and pineapple Development project in greater Sylhet District (Survey, Sub-soil investigation, design, cost estimation, tender document preparation and supervision). | Survey, Sub-soil investigation, design, cost estimation, tender document preparation and supervision | 1st January 2006 to 31st December 2006 |
Name of Project and Location | Description of Project and Service Provided | Duration |
Bangladesh Civil Aviation Authority | ||
Freight Terminal Building of Osmany Airport: Soil Investigation, Plan, Design, Cost Estimate & Tender Document. | Soil Investigation, Plan, Design, Cost Estimate & Tender Document | Jan 94 to Mar 94 |
Name of Project and Location | Description of Project and Service Provided | Duration |
Bangladesh Medical Relief Foundation | ||
Freight Terminal Building of Osmany Airport: Soil Investigation, Plan, Design, Cost Estimate & Tender Document. | Drawing ,Design,Estimation , Supervision Construction |
Name of Project and Location | Description of Project and Service Provided | Duration |
Bangladesh Foundry and Engineering Works ltd. | ||
Proposed Dormitory Building at Gas Plant, Alutall, Sylhet. | Drawing, Design,Estimation , Supervision Construction |
Name of Project and Location | Description of Project and Service Provided | Duration |
Sylhet City Corporation | ||
Laldighi Hawkers Market Architectural Design, Survey, Supervision, Electrical & Mechanical Design, Soil Test, Structural Design, Estimate, Tender Document, Preparation of Schedule etc. | BUILDING | 17-Aug-92 to |
Pouro Biponi Kendra Soil Test, Structural Design, Estimate & Tender Document, Supervision | 20-Aug-91-19-Sep-91 | |
Pouro Municipal Market Soil Test, Structural Design, Estimate & Tender Document, Supervision | Aug-92 to Oct 92 | |
Master Plan & Survey Malnichhara Khal Project. | SURVEYING | 2018 |
Name of Project and Location | Description of Project and Service Provided | Duration |
Moulovibazar Pouroshova | ||
4 Storied KITCHEN MARKET Plan, Design, Estimate, Tender Documents, Survey, Soil test & Report, Model, Full time Supervision. | Plan, Design, Estimate, Tender Documents, Survey, Soil test & Report, Model, Full time Supervision. | Oct 98 to Dec 99 |
Name of Project and Location | Description of Project and Service Provided | Duration |
Hobigonj Pouroshova | ||
Pouro Biponi Kendra Soil Investigation, Plan, Design, Cost Estimate & Part time Supervision. | Soil Investigation, Plan, Design, Cost Estimate & Part time Supervision. | Oct 94 to Dec 94 |
Name of Project and Location | Description of Project and Service Provided | Duration |
Beanibazar Pourashava | ||
4 storied Kitchen Market Drawing, Design, Estimation, Soil Test & Supervision | Drawing, Design, Estimation, Soil Test & Supervision |
Name of Project and Location | Description of Project and Service Provided | Duration |
SUST | ||
4 (Four) Storied School Building at Shahjalal University, Sylhet. Drawing, Design, Estimation, Soil Test & Supervision | BUILDING |
Name of Project and Location | Description of Project and Service Provided | Duration |
Occidental of Bangladesh Ltd. | ||
KAPNA -1 location for Well Site approach road needed to be supplemented by placement of specialize survey equipment— Total Station. | SURVEYING | 18-Apr-99 to 17-May-99 |
To provide Technical & Drafting Assistance (ROW). | 01-Sep-97 to 30-Dec-97 | |
Prepare road survey & BID package for MB#1 damaged road (Sreemangal-Kamalganj road repair project). | 19-Feb-98 to 28-Feb-98 | |
Design & Supervision Consultancy Service for JB#1 Drill Site expansion. | Gas Field Exploration and Facility Service | 01-Jun-97 to 30-Nov-97 |
Determine Degree of compaction % of sub-grade in area Drill Pad & Rig location. | Sep 11, 97- Dec 15, 97 | |
Preliminary Study & designed for river dock for Oxy Materials Department for unloading materials Chengerkhal river. | Jan 18, 98- Feb 18, 98 | |
Additional work for compaction test at Oxy Barashala Pipe yard location. | Jun 10, 98 – Oct 21, 98 | |
To provide Engineering Service regarding preparation of the design for the proposed scope of work-related construction of access road & Drill site development for JB#5/K, located in the Malnicharra & Lackatoorah Tea Garden. | July 28, 98 to August 28,98 | |
To preparing Engineering Drawings/Specification for JB#2-5 Section. | 10-Sep-98 to 22-Sep-98 | |
To provide Temporary Environmental Clearance along the JB#1- JB# 2 Access Rd. & JB#3 by the DOE. | 14-Feb-98 to 21-Feb-98 | |
To provide Engineering Consultancy Service regarding construction of New Drill Pad & Cellar at Oxy BIBIYAYNA location including access Road. | 13-July-98 to 12-Sep-98 | |
To provide Engineering Service & Design Specifications for JB#5 located in the Malnicharra & Lackatoorah Tea Garden. | 21-July-98 to 20-Aug-98 | |
To prepare the Papers/ Documents for Hill Cutting Environmental clearance for JB#1 to JB# 2 & Gas Plant. | 17-Sep-98 to 16-Nov-98 | |
To provide Engineering Service at Slope Protective Work Gas Plant location. | 13-May-99 to 31-July-99 | |
To provide 2 Engineers for Additional Supervision Gas Pipeline / ROW installation for Oxy Gas Plat to Kailastilla. | 17-Sep-98 to 16-Dec-98 | |
To provide project management service for the completion of unfinished portion of job JB#5 location. | 27-Jan-99 to 10-Feb-99 | |
To Prepare Compensation cost estimates for Cracked Structures & Facilitates Possession for the Seismic Survey work BIBIYANA location. | Jan 19, 99 to April 18, 99 | |
To provide Water Table estimation & monitoring for a year the Gas Plant location. | 1-Mar-99 to 28-Feb-00 | |
To provide project management service for the completion of unfinished portion of job at Oxy KAPNA location. | 26-Mar-99 to 9-Apr-99 | |
To provide Engineering Service for JB#5 Access Rd. via Malnicharra Tea Garden (Highway-Garden Factory Section). | 10-Apr-98 to 16-May-98 | |
To prepare Sketch plot plan of well site, design the Flood Protection Dyke & Sketch Cross Section KAPNA location for Well Development. | 8-Apr-99 to 16-May-99 | |
To provide Scope of Work for visit & inspect all the structure Cracked by SEISMIC SURVEY. | 17-Apr-99 to 2-May-99 | |
To provide Engineering Service for MB#2 Well Site Drill Pad Construction. | 20-May-99 to 25-July-99 | |
To provide 2 Field Inspectors for Oxy Donated Tube well installation at BIBIYANA location. | 12-Jun-99 to 11-Sep-99 | |
To provide Engineering Services such as design, cost estimate documents, job supervision for community relations project including KAPNA. | 15-July-99 to 14-Sep-99 | |
Attend Meeting at Oxy/UNOCAL Dhaka office for Maxwell litigation. | 19-Aug-99, 20-Sep-99 | |
To prepare architectural, Structural, Electrical &sanitation design, Engineers Estimate, BID document Preparation & assisting contractor selection, Geo-technical investigation Project work Management/ Supervision to construct DIGALBAG high school at BIBIYANA location. | Jan,17-1999 | |
To provide the L.A.O. in Sylhet with assistance concerning the documents needed to acquire ROW for the North South Pipeline. | Land Acquisition | Land Acquisition 30-Nov-97 to 14-Jan-98 |
To provide the L.A.O. in Sylhet with assistance concerning the documents needed to acquire ROW for the North South Pipeline. | 15-jan-98 to31-jul-98 | |
To provide the L.A.O. in Sylhet with assistance concerning the documents needed to acquire ROW for the North South Pipeline. | 1-Aug-98 to 30-Dec-98 | |
To do Additional Works & time extension, prepare documents, Power of Attorney for absentee landowners & keep photocopies ROW. | 1-Oct-99 to 13-Jan-00 | |
To provide the Land Officer in Sylhet with assistance concerning the documents needed to acquire ROW for the North South Pipeline. | 1-Nov-98 to 31-Nov-98 | |
To Revise Schedule to assist L.A.O. office staffs to Speed up & expedite Cheque payment & Deed checking procedure work of ROW. | 10-Nov-98 to 28-Feb-98 | |
To facilitate Acquisition formalities of ROW for Gas Plant to North South Pipe Line at Kailastilla (Project Manager). | July-99 to October 99 | |
Land Transfer Deed Execution Service (ROW). | 10-Jun-99 to 9-Aug-99 | |
KAPNA Land Transfer Deed Execution Service. | 26-Jun-99 to 30-Oct-99 | |
Railway Embankment Along Gas Field MB-1 . | 24/06/97 to 27/06/97 | |
Feasibility Study for Restoration of Rly. Track along well no MB-1 . | Census and Feasibility Study | 21-Aug-97 to 20-Sep-97 |
Feasibility Study of Transportation Network of the Sylhet, Dhaka & Chittagong area. | 24-Jan-98 to 15-Feb-98 | |
Design & Supervision Consultancy of Gas Plant Access Rd. at Sylhet . | Roads, Railways, Sluice Gate & Bridges | 01-Jun-97 to 30-Sep-97 |
Provide Railway Re-route design consultancy at MB-1 Drill site at Srimangal. | 01-Jun-97 to | |
Provide Structural Analysis of Railroad Bridges . | 28-Jun-97 to | |
Construction, Supervision construction services to upgrade of MABEY Bridge. | 20-Aug-97 to 16-Sep-97 | |
Prepare Design & Specifications for RAILWAY track Relocation at Srimangal. | 30-Aug-97 to 15-Oct-97 | |
Construction Management Consulting Service to install PSB over Doloi river DEWRACHARRA-MUNSHIBAZAR ROAD. | 8-Feb-98 to 5-March-98 | |
To provide Engineering design & cost estimate for the KAPNA river bridge needed for access to KAPNA-1 location. | 2-Apr-99 to 11-May-99 | |
To provide Engineering Service for JB#5 Access Rd. via Malnicharra Tea Garden (Highway-Garden Factory Section). | 10-Apr-98 to 16-May-98 | |
300 ft long Bridge on Dewrachara-Munshirbazar Road in Moulvibazar. | 1989 |
Name of Project and Location | Description of Project and Service Provided | Duration |
Unocal | ||
Land Survey MB Development station | May 2004 | |
Engineering, design, specification, and quality control test services for MB-plant site. | Gas field Exploration and Facility Service. | February 8, 2004 to February 29, 2004 |
Compaction test for quality control services for MB plant. | March 14, 2004 to April 27, 2004 | |
Engineering, design, supervision, geotechnical, quality control, engineering survey and consultancy services for Moulavibazar (MB) development | May 1, 2004 to December 31, 2005 | |
To provide services to study of settlement behavior of oil tank foundation at Moulvibazar (MB) gas plant and provide appropriate corrective measure (services) for the company. | August 25, 2005 to December 31, 2005 | |
To provide services for land acquisition and reacquisition for MB-4 gas gathering pipeline for Moulvibazar (MB) Development. | Land Acquisition | December 23, 2004 to may 30 2005 |
To provide services for land acquisition and reacquisition for Moulvibazar (MB) gas sales pipe line. | March 8 2004 to September 28, 2004 | |
To provide services for land acquisition and reacquisition for MB-5 gas gathering pipeline for Moulvibazar (MB) Development. | February 6, 2005 to May 15 2005 | |
Proposed office building at JB-1 Lackatura, Sylhet | BUILDING | |
To provide Engineering Service for the Construction of DIGALBAK High School | 17-Jun-99 to 16-Dec-99 | |
Dormitory Building Survey, Soil Test, Design (Civil, Electrical & Sanitation), Cost Estimation. | ||
Office building Survey, Soil Test, Design (Civil, Electrical & Sanitation), Cost Estimation. | ||
Warehouse Survey, Soil Test, Design (Civil, Electrical & Sanitation), Cost Estimation. |
Name of Project and Location | Description of Project and Service Provided | Duration |
Sylhet Gas Field | ||
Retrofitting of Control Room Kailashtila Gas Field. | Retrofitting | 2020 |
Design of Slope Protection Correction Work of New Office Building at Sylhet Gas Field Ltd. Chiknagul, Jaintapur, Sylhet. | Slope Protection | 2021 |
Name of Project and Location | Description of Project and Service Provided | Duration |
Jalalabad Gas Transmission & Distribution System. | ||
138Km Gas Pipeline Network Survey of Sylhet Town (3rd Natural Gas Development Project) Kailastilla-Islampur Gas Pipeline Survey, Sub Soil Investigation of Surma river at Kuchai & Chattak. | SURVEYING | Oct 94 to Apr 95 |
Surma River crossing at Kuchai, Sylhet. | SOIL Investigation | |
Surma River crossing at Chhatak, Sunamganj. |
Name of Project and Location | Description of Project and Service Provided | Duration |
Chevron | ||
Fire fighting Utility Building Survey, Soil Test, Design (Civil, Electrical & Sanitation), Cost Estimation. | Survey, Soil Test, Design (Civil, Electrical & Sanitation), Cost Estimation. |
Name of Project and Location | Description of Project and Service Provided | Duration |
Cherrington Asia Ltd. | ||
Survey of Route form Shalutikor Jetty Point to Golapgonj Drill site. | SURVEYING | 30-Oct-98 to 29-Nov-98 |
Name of Project and Location | Description of Project and Service Provided | Duration |
Kaeverner Process System Ltd. Asia Pacific | ||
Supervision (Gas Plant Site), Concrete Cube Test, Compaction test, Bridge & Culvert Design, Gas Plant Access Road & Culvert Works, and Contractors Invoice Checking. | Gas field Exploration and Facility Service. | 12-Feb-98 to 30-Mar-99 |
Supervision (Gas Plant Site), Concrete Cube Test, Compaction test, Bridge & Culvert Design, Gas Plant Access Road & Culvert Works, and Contractors Invoice Checking. | 12-Feb-98 to 30-Mar-99 |
Name of Project and Location | Description of Project and Service Provided | Duration |
Lafarge Surma Cement Ltd | ||
Plane Table & Topo Graphical Survey designated location of CCCL & its link strip of LSC proposed Plant. | SURVEYING | 3-Aug-98 to 2-Sep-98 |
Reconnaissance survey, preliminary Route Planning for Belt Conveyor Way from Chattak Cement Company Ltd. Site to the lime stone query –providing alternative route choice. | June 28,98 – Aug 98 | |
Plain table Survey to exhibit the Railway Infrastructure & incorporate the same in the already prepared location map. | June 28,98 – Aug 98 | |
Detailed Survey Including Fixation of Co-ordination of factory area. | ||
Detailed Survey Including Fixation of Co-ordination of Colony area. | ||
Land Acquisition work for Jetty Area Lafarge Surma Cement Ltd. at Chhatak. | Land Acquisition | 12-Aug-98 to 22-May-00 |
Land Acquisition Work Cement Factory Project, Chhatak. | Soil Investigation | 12-Aug-98 |
Sub-Soil Investigation for Proposed 270 Cubic Metre Water Tank At Chattak, Sunamgonj. | 2017 | |
Approach Road Work at Chhatak: Design & supervision service. | Design & supervision service | January 2008 |
Community Development Building Lafarge Surma Cement Ltd. Chhatak. | June, 2002-April 2003 June, 2002-April 2003 | |
EMP Study of Clay Sourcing | Environmental and Morphology Study | 2020 |
Name of Project and Location | Description of Project and Service Provided | Duration |
Apon Property | ||
B+G+13- Storied Residential Building at Lovely Road, Subid Bazar, Sylhet. Survey, Soil Test, Design (Civil, Electrical & Sanitation) and Cost Estimation. | Survey, Soil Test, Design (Civil, Electrical & Sanitation) and Cost Estimation. | |
15-Storied APON BLUE TOWER at Sagardigir Par, Sylhet. Survey, Soil Test, Design (Civil, Electrical & Sanitation) and Cost Estimation. | Nov. 2009 to dec.2011 | |
14-Storied APON WHITE HOUSE at Sagardigir Par, Sylhet. Survey, Soil Test, Design (Civil, Electrical & Sanitation) and Cost Estimation. | 10 July, 2011 | |
10 Storied APON GULZAR TOWER at Hawapara, Sylhet Survey, Soil Test, Design (Civil, Electrical & Sanitation) and Cost Estimation. | 10 Feb, 2015 to Dec-2019 | |
10 Storied APON HOME at Hawapara, Sylhet Survey, Soil Test, Design (Civil, Electrical & Sanitation) and Cost Estimation. |
Name of Project and Location | Description of Project and Service Provided | Duration |
Paragon Property Limited | ||
10 Storied Residential Paragon Tower-01 Building. Survey, Soil Test, Design (Civil, Electrical & Sanitation) and Cost Estimation. | Survey, Soil Test, Design (Civil, Electrical & Sanitation) and Cost Estimation. | 06 Mar, 07 to Dec-09 |
10 Storied Residential Paragon Tower-02 Building. Drawing, Design, Estimation, Soil Test & Supervision | 15 April, 07 to Feb-10 | |
10 Storied Residential Paragon Tower-03 Building. Survey, Soil Test, Design (Civil, Electrical & Sanitation) and Cost Estimation. | 27 June, 07 |
Name of Project and Location | Description of Project and Service Provided | Duration |
Dreamland Properties Developer | ||
5 Storied Dream Home Residential Building at E-Block Upashahar, Sylhet | Survey, Soil Test, Design (Civil, Electrical & Sanitation) and Cost Estimation. | |
7 Storied Arba Home Residential Building at Shuveccha-100, Fazilchist R/a, Subidbazar, Sylhet | ||
6-Storied Osrah Home Residential Building at Uposhohar-Block:A, Road No:2,House No:08 | ||
7-storied Asar Home Residential Building at Shuveccha-100, Fazilchist R/a, Subidbazar, Sylhet | ||
7-storied RAWDA GARDEN Residential Building at Shuveccha-168, Fazilchist R/a, Subidbazar, Sylhet | 2021-2022 | |
(G+8) Nine Storied AZHAR HOME Residential Building at Shibgonj, Sylhet | 2022-Ongoing |
Name of Project and Location | Description of Project and Service Provided | Duration |
Oyster Poultry Farm | ||
Retrofitting of Poultry firm -2 Buildings | Retrofitting | 2020-2021 |
Construction of 12m Bridge at Oyster poultry farm at Darabazar. | Survey, Soil Test, Design (Civil, Electrical & Sanitation) and Cost Estimation. | 2012 |
Modern Poultry Farmhouse Construction at Darabazar, Sylhet (Drawing, Design, Estimation, Soil Test & Supervision) | ||
Retrofitting of Poultry Shed at Darabazar, Sylhet (Drawing, Design, Estimation, Soil Test & Supervision) |
Name of Project and Location | Description of Project and Service Provided | Duration |
ARK | ||
Survey Work for ARK Real Estate Bridge at Khushi Khal Bridge and approach road Shahporan Upashahar, Sylhet. | Survey, Soil Test, Design (Civil, Electrical & Sanitation) and Cost Estimation. | Nov-2010 |
Construction work of 60m bridge at Muktir Char Shahparan, Uposhahar, Sylhet. | 10 April 2011 |
Name of Project and Location | Description of Project and Service Provided | Duration |
Al-Baraka Property Ltd. | ||
18-meter long R.C.C. Bridge & Approach Road at Knowledge City, Sylhet. | Survey, Soil Test, Design (Civil, Electrical & Sanitation) and Cost Estimation. | 2013 |
Name of Project and Location | Description of Project and Service Provided | Duration |
Popular Diagnostic Centre | ||
10 (Ten) Storied Popular Medical Center at Sylhet. | Survey, Soil Test, Design (Civil, Electrical & Sanitation) and Cost Estimation. | June 2009 to dec.2011 |
Name of Project and Location | Description of Project and Service Provided | Duration |
Lions Club of Sylhet | ||
4 Storied Lions Children Hospital at Sylhet Survey, Soil Test, Plan, Design, Cost Estimate, Tender Document preparation & full time Engineering Supervision. | Survey, Soil Test, Design (Civil, Electrical & Sanitation) and Cost Estimation. | Sep 15, 93 to Dec 25, 93 |
Name of Project and Location | Description of Project and Service Provided | Duration |
Red Crescent Sylhet | ||
Red Crescent Maternity Hospital, Sylhet Drawing ,Design,Estimation & Supervision | Survey, Soil Test, Design (Civil, Electrical & Sanitation) and Cost Estimation. |
Name of Project and Location | Description of Project and Service Provided | Duration |
Mr. Ragib Ali | ||
Retrofitting of Modhuban Super Market. | Retrofitting |
Name of Project and Location | Description of Project and Service Provided | Duration |
Sylhet International University | ||
Retrofitting of Administrative 5 (Five) Storied Building at, Sylhet International University, Sylhet. | Retrofitting |
Name of Project and Location | Description of Project and Service Provided | Duration |
DEMAS Technical Support | ||
Sand Boring in Surma River, Chhatak. Conduct Boring, Necessary Geo-technical Laboratory test & furnishing report. Procurement & supply of Surma river Chhatak Stage for a year. | SOIL Investigation | 08-Nov-98 to 26-Dec-98 |
Name of Project and Location | Description of Project and Service Provided | Duration |
N.C.M.P.D.J Road. | ||
Sub-soil Investigation at N.C.M.P.D.J Road. | SOIL Investigation | 15 Days |
Name of Project and Location | Description of Project and Service Provided | Duration |
Sylhet Partnership | ||
Topographic & Contour Survey of Sylhet Porzaton Corporation (Airport Road Sylhet). |
Name of Project and Location | Description of Project and Service Provided | Duration |
City Corporatation | ||
Master Plan & Survey Malnichhara Khal Project. | SURVEYING | 2018 |
Name of Project and Location | Description of Project and Service Provided | Duration |
Pvt. donor | ||
Construction work of 30m bridge at Alika River , Balaganj | 2006-2008 |
Name of Project and Location | Description of Project and Service Provided | Duration |
Al-Baraka Property Ltd. | ||
18-meter long R.C.C. Bridge & Approach Road at Knowledge City, Sylhet. | Survey, Soil Test, Design (Civil, Electrical & Sanitation) and Cost Estimation. | 2013 |
Name of Project and Location | Description of Project and Service Provided | Duration |
Eastern Housing Sylhet | ||
Land Development at Sylhet | Land Development | Sept. 2009 to dec.2011 |
Name of Project and Location | Description of Project and Service Provided | Duration |
Al-Mocca Housing at Sylhet | ||
Land Development at Sylhet | Land Development | Dec 2009 to Oct.2011 |
Name of Project and Location | Description of Project and Service Provided | Duration |
Jameya Madrasha. | ||
Jameya Islamiya Kamel Madrasha at Pathantula Sylhet. | Survey, Soil Test, Design (Civil, Electrical & Sanitation) and Cost Estimation. | June 2009 to Aug.2011 |
Name of Project and Location | Description of Project and Service Provided | Duration |
Academy Committee | ||
Jalalabad International Islamic Academy, Beanibazar, Sylhet. Drawing, Design, Estimation, Soil Test & Supervision | Survey, Soil Test, Design (Civil, Electrical & Sanitation) and Cost Estimation. |
Name of Project and Location | Description of Project and Service Provided | Duration |
Md. Joynal Uddin | ||
Retrofitting of 4 Storied Building at Beanibazar, Sylhet | Retrofitting | 2021 |
Name of Project and Location | Description of Project and Service Provided | Duration |
Md. Shahidur Rahaman | ||
Retrofitting of 4 Storied Building at Mohajonpotti, Sylhet | Retrofitting | 2021 |